Repair

Our services include repairing fiber glass boats. The scope of repairs to FRP craft includes:

*Surveying the strength of fiberglass lamination of the hull and deck, re-laminating with fiberglass of different textures and enhancing the strength of the hull and deck.

*Re-assembling the engines after servicing / replacing critical parts, followed by testing and recommissioning.

*Modernizing and redesigning the layout of the wheel house, conference room, fly bridge control facilities with appropriate timings.

*Redesigning the layout of the galley, bath and water closet.

*Preparing and finishing the interior / exterior surfaces with polyurethane paints of different shades.

Southern Naval Commandz, Kochi

Size & Type:  12.80 M Cruiser
Quantity: 1 Boat
Work commenced: 1978

bristol boats


Job details:

FRP hull repair and painting


Southern Naval Command, Kochi

Size & Type: 30 M Maine sweeper
Quantity: 2 Boats
Work commenced: 1980
Job details: 20-year-old hull - bottom laminates of four to five layers removed, re laminated and gel coated, Antifouling painting done. FRP fuel tank repaired and re laminated.



Southern Naval Command, Kochi

Size & Type: 13 M Sail Boat
Quantity: 2 Boats
Work commenced: 2009-10

bristol boats

Job details:
FRP hull repair.



Southern Naval Command, Kochi
Size & Type: Solenoids of mine sweeper vessels
Quantity: 8 Boats
Work commenced: 1980

Job details:
20 years old Minesweeper having the solenoids got damaged and OEM (Russian) recommended for replacement. BB took the challenge – after removing FRP layers, re laminated and reconditioned.



Indian Customs
Size & Type: 11.5M petrol Craft
Speed: 22 Knots
Quantity: 2 Boats
Work commenced: 1989

Job details:
FRP Repairs of Hull & Deck – Engine overhauling, stern gears assembly, steering assembly..etc rectified / renewed and reconditioned . Hull & deck FRP repairing, interior & exterior painting, Electrical system renewed and trails.



Odesy’s Cruisers Pvt. Ltd
Size & Type: 12.80M Luxury Craft
Speed: 10 Knots
Quantity: 1 Boats
Work commenced: 1992

Job details:
FRP Repairs of Hull & Deck – Major Engine overhauling ,stern gears assembly, steering assembly rectified and reconditioned, hull & deck FRP repairing, interior & exterior wood work, varnishing, painting, A/C plant renewed, Electrical system renewed, Antifouling paints and trails.



Herbertson Ltd
Size & Type: 12.80M Luxury Craft
Speed:10 Knots
Quantity: 1 Boats
Work commenced:  1993-94

Job details:
FRP Repairs of Hull & Deck – Engine overhauling stern gears assembly, steering assembly, rectified and reconditioned hull & deck FRP repairing, interior & exterior wood work, varnishing, painting, A/C plant renewed, Electrical system renewed, Antifouling paints and trails.



Great Eastern Shipping Co.
Size & Type: 12.80M Luxury Craft
Speed: 10 Knots
Quantity: 1 Boats
Work commenced: 1996

Job details:
FRP Repairs of Hull & Deck – Engine overhauling stern gears assembly, steering assembly, rectified and reconditioned hull & deck FRP repairing, interior & exterior wood work, varnishing, painting, A/C plant renewed, Electrical system renewed, Antifouling paints and trails.



Indian Coast Guard
Size & Type: 12.2M petrol craft
Speed: 22 Knots
Quantity: 1 Boats
Work commenced: 1999

Job details:
FRP Repairs of Hull & Deck – Engine overhauling stern gears assembly, steering assembly, rectified and reconditioned ,hull & deck FRP repairing, interior & exterior woodwork, painting, Electrical system renewed, Antifouling paints and trails.


Oman Police, Oman

Size & Type: 30M Patrolling boat
Quantity: 1 Boats
Work commenced: 2000

bristol boats

Job details:
Major FRP repair of Hull and Deck under water portion and exterior painting at Oman by BB team.



Border Security Force (BSF), Bhuj, Gujarat
Size & Type: 20.8M Patrolling boat
Speed: 20 Knots
Quantity: 2 Boats
Work commenced: 2005

bristol boats

Job details:
Hauling up the vessel at Mandavi port , Kutch - Gujart , repair of defective Hull-deck portions, modifications in interior and exterior Deck, repair and rectifications of A/C plant, Navigational & communication System, Stern gear assembly repair, reconditioning of steering system renewed electrical work , upholstery jobs ,painting of interior and exterior of the crafts.



Cochin Port Trust, Kochi
Size & Type: 15M Pilot Launch
Quantity: 1 Boats
Work commenced: 2007

Job details:
Major overhauling of engine, stern gear assembly, electrical, Navigational and communication equipments repair- replacing, entire Hull of Fwd area about 2M reconstructed. Interior exterior painting done and trails.